Acrolein Injection starting 5th Jan 2026

Acrolein Injection starting 5th Jan 2026

Note that the Stop Time/Date is the time at which EICL staff will shut off the Main offtake and the pump stations. Up until then, supply is guaranteed. Taking water after the Stop Time/Date assists EICL to drain the relevant channel pools/storages, rather than that...
AGM – November 2025

EICL Newsletter Update – November 2025

At a Glance – in this newsletter: No Water Statement with this Invoice – No meter reading this quarter. Clear around your meters. AGM & Director Election – 12 members attended, 5 proxies. John Muscat re-elected. Changes to the EICL Rules – Members require 30ML of...
2023-24 Audit Letter

2023-24 Audit Letter

The Board of Directors Eton Irrigation Cooperative LtdP.O. Box 173Walkerston QLD 4751 Dear Directors, Eton Irrigation Cooperative Ltd Closing Audit Report 30 June 2024 1. INTRODUCTION The audit of Eton Irrigation Cooperative Ltd (the Co-op) has recently been completed...